HomeMy WebLinkAbout87-0422 Tank Industry Consultants RESOLUTION
ACCEPTING THE PROPOSAL OF TANK INDUSTRY CONSULTANTS, INC.
FOR INSPECTION OF OVERHEAD WATER STORAGE TANKS
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS,
that James J. Cook, City Manager, be and is hereby authorized and directed to accept
the proposal on behalf of the City of Elgin of Tank Industry Consultants, Inc. for
inspection of overhead water storage tanks, a copy of which is attached hereto and made
a part hereof by reference.
s/ George Van De Voorde
George VanDeVoorde, Mayor
Presented: April 22, 1 987
Adopted: April 22 , 1987
Vote: Yeas 6 Nays o
Recorded:
Attest:
g/ Marie Yearman
Marie Yearman, City Clerk
TANK INDUS R1' VIZULTANTS, ' '
4912 West 16th Street P.O.Box 24359 Telephone: 317 /244.3221
Speedway,Indiana 46224
March 20, 1987
Mr. Ron Zegers
Director of Water Operations
City of Elgin
150 Dexter Court
Elgin, Illinois 60120
RE: Quotation for Professional Services - 1 Year
Warranty Inspection of Air Light Tank and
Intermittent Work in Process Inspection of
500, 000 Gallon Congdon Avenue Tank
TIC #87-039-03/05
Dear Mr. Zegers:
I am pleased to offer the following proposal in response to
our telephone conversation of March 20, 1987.
Warranty Inspection
The 1 year warranty inspection of the Air Light Tank can be
performed one of two ways. TANK INDUSTRY CONSULTANTS, INC.
can send one technician to perform the inspection with the
"Contractor. The Contractor can then touch up any deficien-
cies found during the inspection. We could also send two
technicians to perform the inspection and prepare a report
of the deficiencies for the Owner. The Owner could then con-
tact the Contractor about repairs. The fee for TANK
INDUSTRY CONSULTANTS, INC. to send one technician to perform
the inspection with the Contractor would be $750. 00. The
fee-for two men to perform the inspection and a written re-
port is $1,400.00.
It will be the Owner ' s responsibility to schedule the inspec-
tion and coordinate the Inspector and the Contractor. We un-
derstand that you intend to have the tank inspected from
rafts. TANK INDUSTRY CONSULTANTS, INC. will supply the
rafts.
The tank level is to be controlled by City of Elgin person-
nel. We also ask that you keep a person near the tank dur-
ing the inspection for safety reasons.
If by cause of the customer the tank is not prepared for in-
spection on the agreed date, and all parties involved are
not present, a charge for mileage and costs of labor, taxes
and insurance will be added to the inspection fee.
Southwest Regional Office: 7211 Regency Square Boulevard • Houston,Texas 77036 • Telephone: 713/789.0989
Mr. Ron Zegers Page 2 March 20, 1987
Work in Process Inspection
We also propose to perform an intermittent inspection of the
Contractor ' s work on the Congdon Avenue Tank. Since we do
not know the scope of work, types of coatings presently on
the tank and extent of repairs which will be required, it
would be difficult to estimate the number of inspections re-
quired. Normally on a 500,000 gallon elevated tank, 8-10 in-
spections would be required. The inspections would be
billed on a time and expenses basis from our enclosed rate
sheet. If the inspections could be combined with work in
the area, we estimate a cost of $500.00-$600.00 per inspec-
tion. If the inspection could not be combined with other
work, we estimate a cost of $600.00-$800.00 per inspection.
Since the Contractor' s progress will dictate the timing of
the inspections, we cannot guarantee the lower cost.
We would perform the first inspection at the start of the
. project to set the ground rules. We would set the standards
for the proper degree of blast cleaning, surface profile,
check -for proper materials, and set guidelines for weather
requirements. During the following inspections we would mea-
sure surface profile of blasted steel, evaluate steel clean-
liness, measure coating thickness, check ventilation and
coating cure, visually examine coated surfaces for deficien-
cies, evaluate the Contractor ' s painting and blasting tech-
niques and finally, during the last inspection, perform a
wet sponge holding test of all submerged surfaces to verify
film integrity. A written report with color photos would be
- given to the Owner and Contractor after each inspection. We
would also recommend the need for, and quantity of structur-
al repairs.
I have enclosed a Qualifications Booklet for your review.
If you should have any questions, please don' t hesitate to
call me.
Sincerely,
T(;;
INDUSTRY CONSULTANTS, INC.
1.).4.---- \2c416
en P. Roetter, E.I.T.
Engineering Marketing Manager
Susan6
SPR/so
Enclosure
TANK INDUSTRY CONSULTANTS, INC.
•
4912 West 16th Street
P.O. Box 24359 MAR ? :j
Speedway, Indiana 46224
Professional Services - Rate Structure
The rate structure to be used for billing your account is
as follows:
Mileage (per vehicle) $0.25/mile traveled from Speedway or
last job, whichever is closer. Travel by public transporta-
tion at cost plus 10%.
Technician rate for Prebid and Work in Process Inspections
Travel time and on job time $37.50/hour
Overtime premium - $10.00/hour = $47.50 over 40
Resident Inspection - Minimum 32 hours per week
Overnight expenses - lodging + meals -- at cost plus 10%
Long-Term Resident Inspection meal allowance = $15/day
Chief Technician rate - $45.00/hour
Clerical Administrative rate - $30.00/hour
Office Assistant rate - $20.00/hour
Engineer rates
Engineer - E.I.T. - $50.00/hour
Engineer - Registered - $57.00/hour
Engineer Senior - Registered - $65.00/hour
Principal Senior Engineer - Registered - $75.00/hour
(E. Crone Knoy, P.E. )
Normally one hour of time at Engineer rate is added to each
non-resident Work in. Process Inspection for dispatching
and report analysis and interpretation.
Ultrasonic thickness testing $100.00 per day + engineer or
technician time + freight for device (if not accompanying us-
ing engineer or technician) . Most Prebid Inspection prices
include the ultrasonic readings if necessary at no addition-
al cost.
TERMS: Net 10 days
08/04/86 ECK
PENNI002/QUOTES/QUOTES3
TANK INDUSTRY ff.01JLTANTS,
4912 West 16th Street P.O.Box 24359 Telephone: 317 /244-3221
Speedway,Indiana 46224 ,
March 20, 1987
Mr. Ron Zegers
Director of Water Operations
City of Elgin
150 Dexter Court
Elgin, Illinois 60120
RE: Quotation for Professional Services - 1 Year
Warranty Inspection of Air Light Tank and
Intermittent Work in Process Inspection of
500, 000 Gallon Congdon Avenue Tank
TIC #87-039-03/05
Dear Mr. Zegers :
I am pleased to offer the following proposal in response to
our telephone conversation of March 20, 1987.
Warranty Inspection
The 1 year warranty inspection of the Air Light Tank can be
performed one of two ways. TANK INDUSTRY CONSULTANTS, INC.
can send one technician to perform the inspection with the
Contractor. The Contractor can then touch up any deficien-
cies found during the inspection. We could also send two
technicians to perform the inspection and prepare a report
of the deficiencies for the Owner. The Owner could then con-
tact the Contractor about repairs. The fee for TANK
INDUSTRY CONSULTANTS, INC. to send one technician to perform
the inspection with the Contractor would be $750.00. The
fee for two men to perform the inspection and a written re-
port is $1,400.00.
It will be the Owner ' s responsibility to schedule the inspec-
tion and coordinate the Inspector and the Contractor. We un-
derstand that you intend to have the tank inspected from
rafts. TANK INDUSTRY CONSULTANTS, INC. will supply the
rafts.
The tank level is to be controlled by City of Elgin person-
nel. We also ask that you keep a person near the tank dur-
ing the inspection for safety reasons.
If by cause of the customer the tank is not prepared for in-
spection on the agreed date, and all parties involved are
not present, a charge for mileage and costs of labor, taxes
and insurance will be added to the inspection fee.
Southwest Regional Office: 7211 Regency Square Boulevard • Houston,Texas 77036 • Telephone: 713/789-0989
•
Mr. Ron Zegers Page 2 March 20, 1987
Work in Process Inspection
We also propose to perform an intermittent inspection of the
Contractor ' s work on the Congdon Avenue Tank. Since we do
not know the scope of work, types of coatings presently on
the tank and extent of repairs which will be required, it
would be difficult to estimate the number of inspections re-
quired. Normally on a 500, 000 gallon elevated tank, 8-10 in-
spections would be required. The inspections would be
billed on a time and expenses basis from our enclosed rate
sheet. If the inspections could be combined with work in
the area, we estimate a cost of $500.00-$600.00 per inspec-
tion. If the inspection could not be combined with other
work, we estimate a cost of $600.00-$800.00 per inspection.
Since the Contractor ' s progress will dictate the timing of
the inspections, we cannot guarantee the lower cost.
We would perform the first inspection at the start of the
. project to set the ground rules. We would set the standards
for the proper degree of blast cleaning, surface profile,
check for proper materials, and set guidelines for weather
requirements. During the following inspections we would mea-
sure surface profile of blasted steel, evaluate steel clean-
liness, measure coating thickness, check ventilation and
coating cure, visually examine coated surfaces for deficien-
cies, evaluate the Contractor ' s painting and blasting tech-
niques and finally, during the last inspection, perform a
wet sponge holding test of all submerged surfaces to verify
film integrity. A written report with color photos would be
given to the Owner and Contractor after each inspection. We
would also recommend the need for, and quantity of structur-
al repairs.
I have enclosed a Qualifications Booklet for your review.
If you should have any questions, please don' t hesitate to
call me.
Sincerely,
T• K INDUSTRY CONSULTANTS, INC.
,
even P. Roetter, E.I .T.
Engineering Marketing Manager
Susan6
SPR/so
Enclosure
TANK INDUSTRY CONSULTANTS, INC.
•
4912 West 16th Street
P.O. Box 24359 MAP 9 �r ,
Speedway, Indiana 46224
iJi
Professional Services - Rate Structure'r' ` " ��L.t'rti , 1�;_LM-
Professional
The rate structure to be used for billing your account is
as follows:
Mileage (per vehicle) $0.25/mile traveled from Speedway or
last job, whichever is closer. Travel by public transporta-
tion at cost plus 10%.
Technician rate for Prebid and Work in Process Inspections
Travel time and on job time $37.50/hour
Overtime premium - $10.00/hour = $47.50 over 40
Resident Inspection - Minimum 32 hours per week
Overnight expenses - lodging + meals -- at cost plus 10%
Long-Term Resident Inspection meal allowance = $15/day
Chief Technician rate - $45.00/hour
Clerical Administrative rate - $30.00/hour
Office Assistant rate - $20.00/hour
Engineer rates
Engineer - E.I.T. - $50.00/hour
Engineer - Registered - $57.00/hour
Engineer Senior - Registered - $65.00/hour
Principal Senior Engineer - Registered - $75.00/hour
(E. Crone Knoy, P.E. )
Normally one hour of time at Engineer rate is added to each
non-resident Work in Process Inspection for dispatching
and report analysis and interpretation.
Ultrasonic thickness testing $100.00 per day + engineer or
technician time + freight for device (if not accompanying us-
ing engineer or technician) . Most Prebid Inspection prices
include the ultrasonic readings if necessary at no addition-
al cost.
TERMS: Net 10 days
08/04/86 ECK
PENNI002/QUOTES/QUOTES3