Loading...
HomeMy WebLinkAbout85-1028 Lords Park Museum Roof RESOLUTION ACCEPTING THE PROPOSAL OF SINGLES ROOFING CO., INC. FOR ROOF REPAIRS AT THE LORD'S PARK MUSEUM BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that James J. Cook, City Manager, be and is hereby authorized and directed to accept the proposal on behalf of the City of Elgin of Singles Roofing Co., Inc. for roof repairs at the Lord's Park Museum, a copy of which is attached hereto and made a part hereof by reference. Richard L. Verbic, Mayor Presented: October 28, 1985 Adopted: Vote: Yeas Nays Recorded: Attest: Nancy Roll, Deputy Clerk We herewith submit our proposal for the following work: 1. Remove the tile roofing from around the two triangle skylites on the north slope, remove old worn and smeared flashings. Install new 30# Felt underlayment, fabricate and install new 16 oz. copper (extra wide) skylite- flashings, reseal glass with elastomeric compound, and refasten tiles over the new underlayment and flashings. 2. Remove unused skylite from the south slope. Install sheathing as needed; cover with new underlayment and tile. 3. Remove tile from around the north chimney, remove old flashings, install new base-flashing over new felt, new saddle, and counter-flashing# of 16 oz. copper and reset tile. 4. Clean the vice-reinforced glass panes on the two large skylites (on top of metal deck) and reseal with elastomeric caulk, 5. Clean the surface of the old copper deck at the top of the roof (470 Sq. Ft.), and install new single-ply membrane roof such as A.R.C. Premium, manufactured by American Roofing Corp. , Chicago, Illinois. 6, Remove all hip-cover tiles from the northwest and southwest hips, remove the cracked mortar which conducts water under the tile roofing, reseal with asphalt mastic cement, and renail the hip-covers (54 Ln. Ft.). 7, Replace all broken tile over the entire roof. We propose to furnish all material, labor, equipment, and full insurance to do the above work, TOTAL COST FOR ABOVE WORK: $ /D J ADDITIONS: 6. Remove two rows of tile above the old copper saddle (29' x 31) over the main entrance, fabricate and install new 16 o:. saddle and renail the over the n �ff2lashing, COST: $ pf.✓ D� -9. Remove one row of tile above all gutters (124 In. Ft.). Install new 16 oz. copper gutters with roof flange; install new Felt aver the new gutter flan&V and under the old underlayment, reinstall tile. COST: $ /II ,S p J afal 1 Singles Roofing Co. Inc. IE OCT 10 1 _ 345 NORTH WILLARD AVENUE • ELGIN, ILLINOIS 60120 • 312-695-0250 Mr. Mike Sarro City of Elgin 150 Dexter Street Elgin Illinois 60120 RE: Elgin Museum Roofing 10-8-85 i ( Mr. Sarro, I To cover our last discussion our company will cover workmanship for one j year labor and material from completion of above work. If there are future questions please call and we will be happy to answer your questions. I h k You I �,�►'� �" ill Charles C. Karmalita V.P. 1 I j i i i i I i