HomeMy WebLinkAbout85-0909 Klaucens (35- tic
RESOLUTION
ACCEPTING THE PROPOSAL OF KLAUCENS & ASSOCIATES, INC.
FOR ENGINEERING SERVICES
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS,
that Robert O. Maim, Acting City Manager, be and is hereby authorized and directed to
accept the proposal on behalf of the City of Elgin of the Klaucens & Associates, Inc. for
engineering services for the pistol range, a copy of which is attached hereto and made a
part hereof by reference.
Richard L. Verbic, Mayor
Presented: September 9, 1985
Adopted:
Vote: Yeas Nays
Recorded:
Attest:
Marie Yearman, City Clerk
(7)
Klaucens & Associates, Inc.
Consulting Engineers
Caporals Office Branch Offices
a1211 Arnold Lane 188 W. Randolph Surat. Stile 1800 976 N. McLean 9oulrvard
Northbrook, lime 60062 Chicago, Mince 90801 E1p n, I11inoia 80120
11112)488.5850 0121726.5186 02)742.5861
July 1 , 1985
City of Elgin
150 Dexter Court
Elgin, IL 60120
Attention: Frank Kaiser
Director of Building Maintenance
Re: Pistol Range Ventilation/Exhaust System Report
City of Elgin, 150 Dexter Court
Dear Mr. Kaiser: .
We submit to you our proposal for Engineering Services for the above
referenced project. This proposal is based on previous discussions
with you and Mr. Warren Tejes of this firm.
We will make all necessary field trips to the site to determine the
existing conditions of the Pistol Range Ventilation/Exhaust System for
evaluation and recommendations.
We will prepare a report on the evaluation of the existing Pistol Range
ventilation/exhaust system with recommendations on upgrading the Pistol
Range ventilation/exhaust system. The report will include cost esti-
mates on the recommended upgrading work (Construction cost and Engineer-
ing fees).
We propose to provide the above outlined Engineering Services for a fee
based on hourly rates times direct personnel expenses and a payroll cost
multiplier of 2.5.
Our fees for basic professional services for the above Engineering
Services shall not exceed $3500.00 (Three thousand five hundred dollars) .
The above fee includes five copies of the report; additional copies
will be reproduced at additional cost; for these you will be billed at
cost without mark-up.
We are grateful for the opportunity you have provided us to submit this
proposal for your consideration, and consequently hope to be of service
to you.
Norbert Klau ere.P.E..President
Should this proposal meet with your approval , kindly have approving
authorities affix signature in the appropriate space and return a
copy to us for our records.
Very
J truly yours,
GGA
QtiGC,*' Go
KLAUCENS & ASSOCIATES, INC.
Warren Tejes
WT:eg
cc: Hr. Richard Krummick, Klaucens & Associates, Inc. , Northbrook
ACCEPTED: DATE:
Klauc ens S. Associates,lac.
01
Our Clientele... Our Story...
Airports Klaucens & Associates, Inc. was amination i i the State of Illinois. He is a
Schools established on October 1, 1965. We pro- member of Nlinois Society of Professional
Hospitals vide Professional Mechanical and Elec- Engineering and has studied Mechanical
Laboratories tical Consulting Engineering and Engineering at the University of hinois
Institutional Buildings associated services. Our clients are and Illinois Institute of Technology. Prior
Hotels & Resorts Owners, and/or their representatives, of to establishing this Finn, he had acquired
Commercial Buildings commercial, industrial, institutional or twelve years of Engineering experience in
Industrial Plants municipal organizations. various positions of responsibility with
Municipal Buildings In order to serve with maximum ethic- Consulting Engineering Offices and
tiveness, each commission, regardless of Mechanical Contractors.
size, combines the expertise of Principal, On staff are approximately thirty
Associates, Architects, Engineers, Associates, Architects, Engineers,
Designers and Draftsmen into a project Designers and Draftsmen, depending on
team to render the client a total and prevailing volume.
complete service. Our corporate headquarters is located
We dedicate ourselves to thoroughly in Northbrook, Nlinois. Branch engineering
Our Area of determine client requirements, assist in offices are located in Chicago and Elgin,
site development, perform any research Illinois, with various project field offices.
Expertise...
and analysis relative to all aspects of the We carry Errors, Omissions and Proles-
project. Our familiarity with local and na- sional Liability Insurance coverage, a cer-
Heating tionwide codes has been acquired due to tificate of which will be submitted to you
Ventilating vast variety of our project locations. upon request.
Air Conditioning Throughout the construction period, field Enclosed is a sample of projects with
Plumbing observation trips are provided as per con- names of respective clients for whom we
Electrical tract agreements. At the termination of have provided and are presently pro-
Fire Protection the project, a thorough inspection is viding Professional Services. We welcome
Energy Audits made to insure conformance of all work you to contact any of our clients and/or
Energy Conservation to the Contract Document requirements references to verify our qualifications and
Structural with a report submitted to the client ac- capabilities. Should you require any fur-
Architectural cordingly. As an end result, the practical ther information relative to our past, pre-
Restoration & Rehabilitation and economical solution to all phases of sent or intended future activities, please
his Construction needs. contact us at your convenience.
The Principal of the Firm is Norbert
Klaucens, who in 1963 became a
Registered Professional Engineer by ex-
KLAUCENS & ASSOCIATES, INC.
Norbert IOaucens, P.E.
President p/ Klaucens S. Assoclates, Inc. .
Consulting Engineers
a i
Warren Tejes
Mechanical Projsa&gam
976 N. McLean Boulevard
Sample of Projects...
Total Cost of
Project Location Construction
Allgauer's Fireside Voest - Restaurant
and Hilton Inn 8 Corporate West Naperville, Illinois S 6,000,000.00
Central National Bank, 200 West Monroe Building
Office 8 Supportive Facilities Chicago, Illinois 1,800,000.00
Chicago Historical Society
Additions 8 Alterations Chicago, Illinois 3,600,000.00
Chrysler Realty Office Building Chicago, Illinois 6,000,000.00
Circus-Circus, Hotel Fun Spa, Hotel Tower Only Las Vegas, Nevada 3,600,000.00
Richard J. Daley Center
Office Building Renovations Chicago, Illinois 13,000,000.00
Evanston/Glenbrook Hospitals Evanston, Illinois
Associate Consultant Services Glenview, Illinois 12,000,000.00
H.M.H. Publishing Co., Inc. and
Playboy International Administrative Offices Chicago, Illinois 3,000,000.00
A.S. Hansen, Inc. Office Building Lake Bluff, Illinois 1,500,000.00
Illinois Association for the Crippled, Inc.
Easter Seal Office Building Chicago, Illinois 4.500,000.00
Illinois College of Optometry Chicago, Illinois 2,500,000.00
Illinois College of Podiatric Medicine Chicago, Illinois 4,500,000.00
Illinois State Capitol Building, Renovations Springfield, Illinois 3,500,000.00
LaCosta Country Club And Resort Hotel Addition
Associate Consultant Services San Diego, California 2,000,000.00
MacNeal Memorial Hospital Renovations Berwyn, Illinois 2,000,000.00
Memorial Hospital for McHenry County
Additions 8 Renovations Woodstock, Illinois 2,000,000.00
Northern Illinois Gas Company
Local Headquarters Office Building Crystal Lake, Illinois 1,000,000.00
O'Hare International Airport Chicago, Illinois 19,000,000.00
Palmer House Hotel Renovations Chicago, Illinois 35,000,000.00
Ravenswood Hospital Chicago, Illinois 2,000,000.00
Saint Joseph Hospital Chicago, Illinois 35,000,000.00
Secretary of State, State of Illinois
Motor Vehicle Facilities Chicago, Illinois 2,000,000.00
Taft High School Air Conditioning Chicago, Illinois 2,500,000.00
Travenol Laboratories, Inc. Cleveland, Mississippi
Office and Laboratory Facilities Mountain Home, Arkansas
at listed Locations Round Lake, Illinois
Morton Grove, Illinois
Hays, Kansas
Deerfield, Illinois
Castlebar, Ireland
Alliston, Ontario, Canada
•
Sao Paulo, Brazil 20,000,000.00
U.S. Post Office, Vehicle Maintenance .
Regional Facility Springfield, Illinois 6,500,000.00
Westgate Executive Park Office Building
Four (4) Buildings Toledo, Ohio 6,000,000.00
Westlake Community Hospital
Surgery Addition 8 Renovations - Melrose Park, Illinois 3,000,000.00
• ,
References...
Mr. N. Melas President Mr. J. F. Sheerin Senior Woe President
The Metropolitan Sanitary Central Region
District of Greater Chicago The Hilton Corporation
100 East Erie Street Palmer House Hotel
Chicago, Wings 60611 17 East Monroe Street
312-751-5700 Chicago, Illinois 60603
312-726-7645
Mr.J. Reinsdorf Chaimran Mr. B. J. Lachner President
BaIcor Property Management, Inc. Evanston Hospital
4711 Golf Road 2650 Ridge Avenue
Skokie, Illinois 60072 Evanston, Illinois 60201
312-677-2900 312-492-4780
Mr. B. KilIgaDon Executive Director Mr. L G. Neel Plant Faa7lties Manager
Public Building Commission Morton Plant Hospital
of Chicago 323 Jeffords Street
Richard J. Daley Center Clearwater, Florida 33517
Chicago, Illinois 60602 813-441-5278
312-7443050
Mr. L. M. Fisher President Dr. R. Murphy Yoe Chairman and
A. S. Hansen, Inc. Vice President
1080 Green Bay Road Alsip Bank & Trust
Lake Bluff, Illinois 60044 11900 South Pulaski Road
312-234-3400 Alsip, Illinois 60658
312-389-9400 •
a
August 19, 1985
MEMORANDUM
TO: Robert Malm
Interim City manager
FROM: Robert Baird
Chief of Police'
SUBJECT: Pistol Range Ventilation/Exhaust System
The 1985 Capital Improvement Fund includes the sum of $26,400 for police
pistol range equipment and improvements. The first item to be addressed
in this project is the complete analysis of the pistol range ventilation
and exhaust system from an engineering perspective for evaluation and
recommendations.
•
Attached to this memorandum is a letter from Mr. Warren Tejes of Klaucens
& Associates, Inc. , a consulting engineering firm with expertise in ven-
tilation and exhaust work. The letter proposes engineering services re-
sulting in a report on the evaluation of the existing range ventilation/
exhaust system and appropriate recommendations. Klaucens' fee for these
basic professional services shall not exceed $3,500.
I recommend that this proposal from Klaucens & Associates be accepted. I
request that this matter be brought to the attention of the City Council
at their August 26, 1985, meeting for their review and disposition.
Attachment
, . ,
„ r: Klaucens & Associates, Inc.
� -- _- Consulting Engineers
Corporate Office Branch Offices
a3211 Arnold Lane 188 W. Randolph Street, Suite 1800 976 N. McLean Boulevard
Northbrook, Illinois 60062 Chicago, Illinois 60601 Elgin, Illinois 60120
(312)198.5950 (312)726.5186 (312)742.5651
July 1 , 1985
City of Elgin
150 Dexter Court
Elgin, IL 60120
Attention: Frank Kaiser
Director of Building Maintenance
Re: Pistol Range Ventilation/Exhaust System Report
City of Elgin, 150 Dexter Court
Dear Mr. Kaiser: .
We submit to you our proposal for Engineering Services for the above
referenced project. This proposal is based on previous discussions
with you and Mr. Warren Tejes of this firm.
We will make all necessary field trips to the site to determine the
existing conditions of the Pistol Range Ventilation/Exhaust System for
evaluation and recommendations.
We will prepare a report on the evaluation of the existing Pistol Range
ventilation/exhaust system with recommendations on upgrading the Pistol
Range ventilation/exhaust system. The report will include cost esti-
mates on the recommended upgrading work (Construction cost and Engineer-
ing fees).
We propose to provide the above outlined Engineering Services for a fee
based on hourly rates times direct personnel expenses and a payroll cost
multiplier of 2.5.
Our fees for basic professional services for the above Engineering
Services shall not exceed $3500.00 (Three thousand five hundred dollars).
The above fee includes five copies of the report; additional copies
will be reproduced at additional cost; for these you will be billed at
cost without mark-up. ,
We are grateful for the opportunity you have provided us to submit this
proposal for your consideration, and consequently hope to be of service
to you.
Norbert Kiaucens, P.E.,President
Should this proposal meet with your approval , kindly have approving
authorities affix signature in the appropriate space and return a
copy to us for our records.
Very truly yours,
GL/u4
KLAUCENS & ASSOCIATES, INC.
Warren Tejes
WT:eg
cc: Mr. Richard Krummick, Klaucens & Associates, Inc. , Northbrook
ACCEPTED: DATE:
, .
•
Klaucens 5. Associates,Inc.
Consulting Engineers
a
Our Clientele... Our Story...
Airports Klaucens & Associates, Inc. was amination in the State of Illinois. He is a
Schools established on October 1, 1965. We pro- member of Illinois Society of Professional
Hospitals vide Professional Mechanical and Elec- Engineering and has studied Mechanical
Laboratories trical Consulting Engineering and Engineering at the University of Illinois
Institutional Buildings associated services. Our clients are and Illinois Institute of Technology. Prior
Hotels & Resorts Owners, and/or their representatives, of to establishing this Firm, he had acquired
Commercial Buildings commercial, industrial, institutional or twelve years of Engineering experience in
Industrial Plants municipal organizations. various positions of responsibility with
Municipal Buildings In order to serve with maximum effec- Consulting Engineering Offices and
tiveness, each commission, regardless of Mechanical Contractors.
size, combines the expertise of Principal, On staff are approximately thirty
Associates, Architects, Engineers, Associates, Architects, Engineers,
Designers and Draftsmen into a project Designers and Draftsmen, depending on
team to render the client a total and prevailing volume.
complete service. Our corporate headquarters is located
We dedicate ourselves to thoroughly in Northbrook, Illinois. Branch engineering
Our Area of determine client requirements, assist in offices are located in Chicago and Elgin,
site development, perform any research Illinois, with various project field offices.
Expertise••• and analysis relative to all aspects of the We carry Errors, Omissions and Profes-
project. Our familiarity with local and na- sional Liability Insurance coverage, a cer-
Heating tionwide codes has been acquired due to tificate of which will be submitted to you
Ventilating vast variety of our project locations. upon request.
Air Conditioning Throughout the construction period, field Enclosed is a sample of projects with
Plumbing observation trips are provided as per con- names of respective clients for whom we
Electrical tract agreements. At the termination of have provided and are presently pro-
Fire Protection the project, a thorough inspection is viding Professional Services. We welcome
Energy Audits made to insure conformance of all work you to contact any of our clients and/or
Energy Conservation to the Contract Document requirements references to verify our qualifications and
Structural with a report submitted to the client ac- capabilities. Should you require any fur-
Architectural cordingly. As an end result, the practical ther information relative to our past, pre-
Restoration & Rehabilitation and economical solution to all phases of sent or intended future activities, please
his Construction needs. contact us at your convenience.
The Principal of the Firm is Norbert
Klaucens, who in 1963 became a
Registered Professional Engineer by ex-
KLAUCENS & ASSOCIATES, INC.
Norbert Klaucens, P.E.
President
/ /p/' Klaucens & Associates, Inc. .
Consulting Engineers
a I warren Tejes
Mechanical Project Engineer
•
976 N. McLean Boulevard
Elgin, INinois 90120
11.01 719_RR41
Sample of Projects...
Total Cost of
Project Location Construction
Allgauer's Fireside West - Restaurant
and Hilton Inn & Corporate West Naperville, Illinois $6,000,000.00
Central National Bank, 200 West Monroe Building
Office & Supportive Facilities Chicago, Illinois 1,800,000.00
Chicago Historical Society
Additions & Alterations Chicago, Illinois 3,600,000.00
Chrysler Realty Office Building Chicago, Illinois 6,000,000.00
Circus-Circus, Hotel Fun Spa, Hotel Tower Only Las Vegas, Nevada 3,600,000.00
Richard J. Daley Center
Office Building Renovations Chicago, Illinois 13,000,000.00
Evanston/Glenbrook Hospitals Evanston, Illinois
Associate Consultant Services Glenview, Illinois 12,000,000.00
H.M.H. Publishing Co., Inc. and
Playboy International Administrative Offices Chicago, Illinois 3,000,000.00
A.S. Hansen, Inc. Office Building Lake Bluff, Illinois 1,500,000.00
Illinois Association for the Crippled, Inc.
Easter Seal Office Building Chicago, Illinois 4,500,000.00
Illinois College of Optometry Chicago, Illinois 2,500,000.00
Illinois College of Podiatric Medicine Chicago, Illinois 4,500,000.00
Illinois State Capitol Building, Renovations Springfield, Illinois 3,500,000.00
LaCosta Country Club And Resort Hotel Addition
Associate Consultant Services San Diego, California 2,000,000.00
MacNeal Memorial Hospital Renovations Berwyn, Illinois 2,000,000.00
Memorial Hospital for McHenry County
Additions & Renovations Woodstock, Illinois 2,000,000.00
Northern Illinois Gas Company
Local Headquarters Office Building Crystal Lake, Illinois 1,000,000.00
O'Hare International Airport Chicago, Illinois 19,000,000.00
Palmer House Hotel Renovations Chicago, Illinois 35,000,000.00
Ravenswood Hospital Chicago, Illinois 2,000,000.00
Saint Joseph Hospital Chicago, Illinois 35,000,000.00
Secretary of State, State of Illinois
Motor Vehicle Facilities Chicago, Illinois 2,000,000.00
Taft High School Air Conditioning Chicago, Illinois 2,500,000.00
Travenol Laboratories, Inc. Cleveland, Mississippi
Office and Laboratory Facilities Mountain Home, Arkansas
at listed Locations Round Lake, Illinois
Morton Grove, Illinois
Hays, Kansas
Deerfield, Illinois
Castlebar, Ireland
Alliston, Ontario, Canada
•
Sao Paulo, Brazil 20,000,000.00
U.S. Post Office, Vehicle Maintenance
Regional Facility Springfield, Illinois 6,500,000.00
Westgate Executive Park Office Building
Four (4) Buildings Toledo, Ohio 6,000,000.00
Westlake Community Hospital
Surgery Addition & Renovations - Melrose Park, Illinois 3,000,000.00
V f
•
References...
Mr. N. Males President Mr. J. F. Sheerin Senior Vice President
The Metropolitan Sanitary Central Region
District of Greater Chicago The Hilton Corporation
100 East Erie Street Palmer House Hotel
Chicago, Illinois 60611 17 East Monroe Street
312-751-5700 Chicago, Illinois 60603
312-726-7645
Mr.J. Reinsdorf Chairman Mr. B. J. Lachner President
Balcor Property Management, Inc. Evanston Hospital
4711 Golf Road 2650 Ridge Avenue
Skokie, Illinois 60072 Evanston, Illinois 60201
312-677-2900 312-492-4780
Mr. B. IGIlgallon Executive Director Mr. L G. Neel Plant Facilities Manager
Public Building Commission Morton Plant Hospital
of Chicago 323 Jeffords Street
Richard J. Daley Center Clearwater, Florida 33517
Chicago, Illinois 60602 813-441-5278
312-744-3050
Mr. L. M. Fisher President Dr. R. Murphy Vice Chairman and
A. S. Hansen, Inc. Vice President
1080 Green Bay Road Alsip Bank & Trust
Lake Bluff, Illinois 60044 11900 South Pulaski Road
312-234-3400 Alsip, Illinois 60658
312-389-9400