CHANGE ORDER NO.1 & FINAL
SCOPE. This Change Order No.1 & Final covers the addition of the cost
of labor and material to the contract for the repair of a defective
culvert under the approach to Spartan Meadows Parking Lot.
REASON FOR CHANGE. During the excavation for the new asphalt approach
the contractor uncovered a void that had been caused by a defective joint
in the existing corrugated metal culvert. The contractor was directed to
clear an area down to and around the pipe. A city crew then made the
necessary repair to the culvert and the contractor filled the resulting
excavation with compacted CA-9.
CHANGE IN CONTRACT AMOUNT.
Labor $705.23
Materials 184.22
Total $889.45
By reason of this Change Order No.1 & Final , the cost shall be increased
in the amount of Eight hundred eighty-nine and 45/100 Dollars ($889.45).
OTHER CONTRACT PROVISIONS. All other provisions of the contract shall
remain the same.
Agreed to this 22n44._ day ofOciotr..r- , 1984.
Recommended: Approved:
ENGINEERING DIVISION CITY I GIN
By Par y ,ilf - Fi St Part (Owner)
Br*-AiLV .9r1 Alik di
/
tivivari
Title "Agardr,eiviwr;
Date: October 3, 1984
Accepted:
CURRAN CONSTRUCTION COMPANY
Party gfthe-Second 1/yx-tn(Co .r, 'r)
By
Title
•
HIGHWAYS STREETS AIRPORTS ASPHALT PATCHING MATERIAL TARS ROAD OILS
tURRA
ONTRACTINO
OMPANY
7502 SOUTH MAIN STREET.CRYSTAL LAKE.ILUNOIS 80014 • 815/455-5100
August 31 19 84
Sold To City of Elgin
150 Dexter Court Invoice No. 84-572
Elgin, Illinois 60120
Your Order No.
Atten: Ralph Ridley Customer No. 10250
Terms
Job # 84038
Extra Work at Entrance
Foreman - 3 hrs. @ 35.80 $ 107 40
#2664 Loader w/oper. 2 hrs. @ 58.95 117 90
#3762 Roller w/oper. 1/2 hr. @ 46.85 23 43
6-wheel dump w/driver 5 hrs. @ 42.00 210 00
Labor 10 hrs. @ 24.65 246 50
30.2 ton Grade 9 @ 6.10 184 22
$ 889 45
•
PLEASE REMIT TO:
CURRAN CONTRACTING CO.
P.O. BOX 94565
Chicago, Illinois 60690
C
D
ic% C
1;11
0 259176
•
THE NATION'S LEADING PRODUCER OF ."
1:&1 CONSTRUCTION AGGREGATES'
OS(
Vulcan Materials Compan N‘le"
MIDWEST DIVISION 600 WEST PLAINFIELD RD.•COUNTRYSIDE,IL 60526
1111 I
y47 : o t
SHIPPING LOCATION:
7 "40 Fr"1.-ii4r..,.57'
PA„,
DATE TIME PLANT
r„,. 7 .•';
CUSTOMER SALES
NO • • ORDER NO. '
(
SHIP TO - C r
HAULER TRUCK NO. DELIVERY TYPE
PRODUCT CUSTOMER P.O.NO
nuGROSS* TARE" NET. NET TONS WEIGHER,.
COMMENTS:
CASH SALE ONLY
PROD HAUL TAX TOTAL
PER TON
111
AMOUNT
•NEW ROUNDED
TO NEAREST 100 UM
11111
DRIVER COPY
I
T
258964
THE NATION'S LEADING PRODUCER OF
CONSTRUCTION AGGREGATES _
\
Vulcan Materials Company 'Nee
MIDWEST DIVISION•500 WEST PLAINFIELD RD.•COUNTRYSIDE.IL 80526
1 iia
SHIPPING LOCATION:
CcARRIER RECEIVED SY
..4.14**"04' •
x-iifikilt 4/, I'W• 4
ifAr •
DATE ' TIME PLANT 4 g
CUSTOMER SALES
NO ORDER NO A
SHIP TO 1
HAULER TRUCK NO DELIVERY TYPE
PRODUCT CUSTOMER P.O.NO.
AAAA GROSS* TARE* NET NET TONS WEIGHER
Wes''''•4‘"
COMMENTS:
CASH SALE ONLY
PROD HAUL TAX TOTAL
PER TON Al;?k/i
AMOUNT Jii6
•WEIGHT ROUNDED
A A ri TO NEAREST 100 1.83
CUSTOMER COPY-1
October 3, 1984
MEMORANDUM
TO: Bob Maim, Acting City Manager
FROM: Ralph Ridley, Civil Engineer I
RE: Spartan Meadows Parking Lot
Change Order No.1 & Final
The above referenced project was completed on August 31 , 1984. The
work included a new two inch (2") asphalt overlay in the approach area
and A-2 Sealcoat in the remainder of the lot.
When the contractor, Curran Contracting Company, excavated the area
of the approach they found a portion of existing drainage culvert had
separated. This separation undermined the existing approach causing a void
which had to be repaired. Curran excavated the faulty culvert joint and a
City crew made the necessary repair. The cost of this extra work to
excavate and backfill the problem area amounted to $889.45 (copy of invoice
attached).
The original contract for this project was $12,107.50. Because of this
Change Order No.1 & Final , the final contract price will be $13,096.95.
Based on the attached Change Order and Invoice, we would recommend that the
City Council approve Change Order No.1 & Final .
RLR:do
Attachment
cc: Mel Dahl
Phil Bennett
Gary Miller /
Marie Yearman
Dan Blondin
Mike Sarro
HIGHWAYS STREETS AIRPORTS ASPHALT PATCHING MATERIAL TARS ROAD OILS
ONTRACTING
OMPANY •
7502 SOUTH MAIN STREET,CRYSTAL LAKE,IWNOIS 00014 • 0151455.5100
August 31 79 84
Sold To City of Elgin
150 Dexter Court Invoice No. 84-572
Elgin, Illinois 60120
Your Order No.
Atten: Ralph Ridley Customer No. 10250
Terms
Job # 84038
Extra Work at Entrance
Foreman - 3 hrs. @ 35.80 $ 107 40
#2664 Loader w/oper. 2 hrs. @ 58.95 117 90
#3762 Roller w/oper. 1/2 hr. @ 46.85 23 43
6-wheel dump w/driver 5 hrs. @ 42.00 210 00
Labor 10 hrs. @ 24.65 246 50
30.2 ton Grade 9 @ 6.10 184 22
$ 889 45
•
PLEASE REMIT TO:
CURRAN CONTRACTING CO.
P.O. BOX 94565
Chicago, Illinois 60690
s
ELGIN, ILLINOIS
SPARTAN MEADOWS PARKING LOT
CHANGE ORDER NO.1 & FINAL
SCOPE. This Change Order No.1 & Final covers the addition of the cost
of labor and material to the contract for the repair of a defective
culvert under the approach to Spartan Meadows Parking Lot.
REASON FOR CHANGE. During the excavation for the new asphalt approach
the contractor uncovered a void that had been caused by a defective joint
in the existing corrugated metal culvert. The contractor was directed to
clear an area down to and around the pipe. A city crew then made the
necessary repair to the culvert and the contractor filled the resulting
excavation with compacted CA-9.
CHANGE IN CONTRACT AMOUNT.
Labor $705.23
Materials 184.22
Total $889.45
By reason of this Change Order No.1 & Final , the cost shall be increased
in the amount of Eight hundred eighty-nine and 45/100 Dollars ($889.45).
OTHER CONTRACT PROVISIONS. All other provisions of the contract shall
remain the same.
Agreed to this day of , 1984.
Recommended: Approved:
ENGINEERING DIVISION CITY OF ELGIN
Party of the First Part (Owner)
By
Title
Date: October 3, 1984
Accepted:
CURRAN CONSTRUCTION COMPANY
Party of the Second Part (Contractor)
By
Title