HomeMy WebLinkAbout84-0421 west Side Plant Change Order No.2 1177 PF g ELGIN, ILLINOIS WATER WORKS IMPROVEMENTS MAR 2 1 1934 CONTRACT NO. 5 WEST SIDE PLANT IMPROVEMENTS CITY� OF ELGIN ENGINEERING CHANGE ORDER NO. 2 SCOPE. This Change Order No. 2 covers additions and modifications to the above contract as follows: Item 1. The substantial completion date and the final completion date for the subject project shall each be extended 145 days. The substantial completion date shall be extended from November 7, 1983 to March 31, 1984 and the final completion date for all work under the contract shall be extended from January 6, 1984 to May 30, 1984. Item 2. The Contractor shall provide adequate covering of the recarbonation basin and one primary basin to prevent them from freezing during the winter months. The coverings shall provide sufficient access to the basins to allow the Owner to maintain proper operation and maintenance of the basins. The locations and arrangement of all points of access to the basins shall be acceptable to the Owner. Item 3. The reconditioned CO2 storage tank manufactured by Liquid Carbonic Corporation and furnished and installed under this contract shall be acceptable. The acceptance of the reconditioned storage vessel for one of all new construction shall include a credit of $700.00 to the Owner for this substitution. .All other conditions of the contract documents regarding this equipment shall remain the same. REASON FOR CHANGE. Item 1. The extension of time is due to additional work added under Change Order No. 1 and failure of equipment suppliers to meet promised submittal and delivery dates. The additional basin work included under the previous change order has required addi- tional time to complete. Delays in some equipment deliveries have been beyond the control of the Contractor. Item 2. Manpower limitations will limit the manned operations of the West Side Plant to 8 hours per day until the improvements which will provide continuous 24 hour operation with remote monitoring have been completed. The protective coverings will prevent the basins from freezing during periods the plant is not in operation. (ELGIN, ILLINOIS ) (WATER WORKS IMPR.) CO2-1 (CONTRACT NO. 5 ) Item 3. The CO2 storage tank, manufactured by Liquid Carbonic Cor- poration, was furnished and installed before it was discovered that the storage vessel was not of all new construction. Without the prior knowledge of the Engineer and Owner, a reconditioned storage tank had been furnished. The tank manufacturer offered a $700.00 credit to the Owner for the substitution of the reconditioned vessel in lieu of the all new constructed vessel specified. SUMMARY OF CHANGES IN CONTRACT AMOUNT. The contract amount shall be revised on the following basis: Deduct Item 1. Time extension. No change in contract amount. - Item 2. Basins protective coverings. No change in contract amount. - Item 3. CO2 Storage Tank credit. 700.00 Total Deduct to the Contract Amount $700.00 By reason of this Change Order No. 2, the contract cost shall be decreased in the amount of Seven Hundred and 00/100 Dollars ($700.00) . OTHER CONTRACT PROVISIONS. All other provisions of the contract shall remain the same. j AGREED to this 8(57- day of X� �"��4-- , 1984. Recommended: Approved: BLACK & VEATCH CITY OF ELGIN, ILLINO S ' Party of the First Lit owner) By �' 1/,/ �. a � By : . v/A Date: February 28, 1984 Title Cs/P? &/.''-; /lr-✓Z.. Accepted: SEAGREN/SHALES, INC. Party of the Second Part (Contractor) By LAS) 04e- 4-e Title (ELGIN, ILLINOIS ) (WATER WORKS IMPR.) CO2-2 (CONTRACT NO. 5 )